EPC Portfolio Overview · Q2 2024 · 18 Active Projects
Cross-Module Alert Feed
All projectsP80 contingency shortfall — SAR 1.9M
Monte Carlo analysis shows contract contingency covers only 68% of P80 cost-at-risk. Subcontractor collapse (RSK-004) is the primary driver at SAR 1.20M EV.
MV Cable — 25 day slip on PO-2024-104
Nexans delivery now forecast Oct 5 vs Sep 10 contract date. Critical path impact if >15 days unrecovered. Open RSK-003 linked.
BOQ Final Revision overdue — 2 days past SLA
NEOM Solar Farm BOQ revision awaiting PM sign-off. Change order cannot proceed until approved.
NCR-2024-019: HV cable bend radius — open 8 days
Cable bending radius NCR at Zone A cable route entry still open. Structural re-work required before FAT can proceed.
PTW-2024-185 pending approval — works blocked
Module installation on Zone A tracker rows 30–45 blocked. PTW requires HSE Manager sign-off before 07:00.
Payment Cert #7 — SAR 3.2M certified, pending transfer
Client payment certificate issued. Awaiting bank transfer. Expected receipt Jul 12.
FAT re-scheduled — ABB Transformer Jul 25
Factory Acceptance Test moved from Jul 18 to Jul 25 due to ABB test bay availability. Recovery plan accepted.
Today on Site
Jul 10, 2026S-Curve — NEOM Solar Farm (400 MW)
Planned vs Actual vs Earned Value · % complete
Schedule Performance Index
0.93
Behind schedule
Cost Performance Index
1.02
Under budget
Forecast at Completion
SAR 47.1M
vs SAR 48M budget
Project Health
NEOM Solar Farm
Procurement
Riyadh EPC-07
Engineering
Jeddah Substation
Construction
KAEC Solar 400MW
Pre-Contract
Yanbu Industrial EPC
Finance
EPC Workflow — NEOM Solar Farm (400 MW)
7 phases · 50 steps · Currently at Step 23: Committee Approval (Procurement & Supply Chain)
Portfolio Spend vs Budget (SAR M)
Projects by Stage
Pending Approvals
5BOQ Final Revision — NEOM Solar Farm
HIGHSubcontractor Contract — Al-Qurayyah
HIGHPayment Certificate #7 — Riyadh EPC-07
MEDIUMIFC Drawing Package v3 Review
MEDIUMVendor Quotation Comparison Sheet
LOWActivity Log
Last 24 hoursSarah Chen approved BOQ Revision 3
2 minutes ago
Ahmed Al-Rashidi uploaded IFC Drawings Package v2
18 minutes ago
Mohammed Hassan commented on Subcontractor RFQ
1 hour ago
Fatima Al-Zahra moved project to Construction Phase
3 hours ago
Consultant Reviewer rejected NCR #045 corrective action
Yesterday
Omar Abdullah assigned task to HSE Manager
Yesterday
AI Insights
AIGrindMindEPC Analysis
Procurement delay risk detected
Approval bottleneck identified
QA/QC pass rate improving